First Information Announcement on Public Participation in Environmental Impact Assessment of Precious Metal Secondary Resources Comprehensive Recycling and Product Deep Processing Expansion Project
According to the "Measures for Public Participation in Environmental Impact Assessment" (Ministry of Ecology and Environment Order No. 4) issued by the Ministry of Ecology and Environment of the People's Republic of China on July 16, 2018, the information about the environmental impact assessment work of "Comprehensive Recycling of Secondary Resources of Precious Metals and Product Deep Processing and Expansion Project" is hereby announced, and the announcement is as follows:
First, the name and outline of the construction project
Project name: the comprehensive recycling of secondary resources of precious metals and deep processing of products to expand the project
Project nature: expansion and renovation
Construction unit: Yunlong County Platinum Cui Precious Metals Technology Co.
Construction Location: Caojian Town Industrial Park, Yunlong County, Dali Prefecture, Yunnan Province
Construction content and scale:
The expansion will be carried out within the existing plant area and will not involve new land. The expansion of fire enrichment workshop and supporting facilities, pretreatment workshop, wet enrichment workshop and refining workshop will remain unchanged. According to the relevant specifications, the area of new thermal enrichment workshop is 1400m2; the area of new acid storage is 300m2; the area of new neutralization mud storage is 400m2; the area of new thermal smelting slag storage is 300m2; the area of new hazardous waste temporary storage is 30m2; the area of new R&D laboratory building is 576m2; the area of new three raw material storage is 670m2, 336m2 and 700m2 respectively; the existing thermal enrichment workshop will be transformed into thermal pilot plant. The existing fire enrichment workshop will be transformed into a fire test workshop with an area of 576m2.
The main technical reform equipment of the expansion are: pretreatment workshop new closed conveyor output and automatic sampling system; a 2t coal-fired boiler will be removed and replaced by a 2t electric boiler; two new 4t roasters in the fire enrichment workshop; one new 0.5t medium frequency furnace; two new 1.5t smelting furnace; refining workshop extraction equipment technical reform for resin tower, other equipment with the expansion of production scale. Other equipment will be increased accordingly with the expansion of production scale.
After the completion of the expansion, the annual processing volume of 12,000 tons of materials.
Second, the name of the construction unit and contact information
Construction unit: Yunlong County Platinum Cui Precious Metals Technology Co.
Contact person: Shen Shi
Contact number: 15198997342
Third, to undertake the environmental impact assessment agencies and contact information
Evaluation agency: Yunnan Hubei Environmental Protection Technology Co.
Contact Person: Mr. Liu
Tel: 15398646220
E-mail: 1315804692@qq.com
Fourth, the environmental impact assessment procedures and the main content
1、Working procedures of environmental impact assessment
Survey of the current situation of the construction project → survey and monitoring of the current situation of the surrounding environment of the construction project, collecting relevant information → engineering analysis → environmental impact prediction evaluation → organization of public participation survey → proposals for corrective measures → preparation of the environmental impact report → report for examination
2、Environmental impact assessment main work content
(1) Project overview and engineering analysis
(2) Environmental status survey and evaluation
(3) Environmental impact prediction and evaluation
(4) Analysis of environmental protection measures
(5) Environmental monitoring, supervision and management plan evaluation
(6) environmental protection investment and environmental protection benefit analysis
(7) Environmental risk analysis
(8) Public participation survey and analysis
(9) Comprehensive conclusions and recommendations
V. Main matters for public opinion
Environmental protection requirements and suggestions for the project construction
Sixth, the main way of public opinion
1、Fill in the public participation questionnaire issued by the construction unit;
2、Contact with the construction unit or evaluation unit in written form by letter, fax, e-mail, etc.
3、You can enter the following link to download the public opinion form and fill it out, which can be submitted to the construction unit or the EIA unit by mail or letter.
http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html
VII. Starting and ending time for the public to submit comments
The project public notice period is 10 working days from the time of public notice.
If the public wants to know more about the project or has any comments and suggestions, please contact the construction unit or the evaluation unit.
Hereby publicized.
Yunlong County Platinum Cui Precious Metals Technology Co.
July 17, 2019
Latest News
2023-01-10
Yunlong County Platinum Cui Precious Metals Technology Co.
The main pollutants of our company are particulate matter, SO2, NOx, VOCs, other characteristic pollutants (sulfuric acid mist, chlorine (chlorine gas), hydrogen chloride, nitric acid mist, fluorine and its compounds, Ringman blackness, lead, mercury and its compounds, flue gas blackness, ammonia (ammonia), odor concentration, hydrogen sulfide), air pollutant emission form is divided into organized, unorganized, exhaust gas through the pulse bag dust collection equipment and The exhaust gas is treated by pulse bag dust collection equipment and three-stage spraying and absorption equipment to meet the standard before emission.
2023-01-09
Ltd. in the fourth quarter of 2022 self-monitoring results statistics
Ltd. in the fourth quarter of 2022 self-monitoring results statistics
2022-10-13
Yunlong County Platinum Cui Precious Metals Technology Co., Ltd. 2022 third quarter self-monitoring results statistics
Yunlong County Platinum Cui Precious Metals Technology Co., Ltd. 2022 third quarter self-monitoring results statistics
2022-04-11
The first quarter of 2022 self-monitoring results of Yunlong County Platinum Cui Precious Metals Technology Co.
The first quarter of 2022 self-monitoring results of Yunlong County Platinum Cui Precious Metals Technology Co.
2022-01-19
Yunlong County Platinum Cui Precious Metals Technology Co., Ltd. 2021 self-monitoring IV
Yunlong County Platinum Cui Precious Metals Technology Co., Ltd. 2021 self-monitoring IV